Indian Railways RailFlow

LIVE| (IST)

Punctuality

92.5%

Target: 95%
0.5%

Avg. Delay

8.5 min

Target: < 5 min
1.2m

Active Trains

450

Capacity: 600
12

Disruptions (24h)

5

Total: 25
2

Disruptions Queue

Signal Failure

High

Ghaziabad Junction

Complete signal failure on lines 3 and 4. RRI team dispatched. ETA 45 mins.

Affected Trains:
12301
22439

Track Blockage

Medium

Asansol

Debris on track due to local construction work. Line clearing in progress.

Affected Trains:
12301

Passenger Incident

Low

Nagpur

Medical emergency reported in coach S5. Awaiting paramedic team.

Affected Trains:
12951

Live Train Positions

AI Copilot

Analyzing network data...